September’s “Second Saturday” Zoom layout tour has been postponed a month, due to the joint NP/GN convention layout tours taking place across the region on Sept 14. The next Zoom layout tour will be held at 10am on Saturday, October 12, featuring local modeler Kevin Wills. Kevin’s layout is a freelanced mainline extension of the Santa Fe and Southern Pacific lines through the western Sierra Nevada mountain area roughly set in the 1980s. His 33’x13′ basement layout transits three levels, with staging, main yard with turntable and engine maintenance facilities, switching in various towns and long mainline stretches of track. A train can take up to an hour to transit the entire layout at scale speed. The mainline is fully signaled with a full-hardware CTC panel. A branch line is included in dark territory just to make it more interesting. Scenery is about 75-80% complete. Please plan to attend if you can.
As usual, we will open the Zoom meeting at 9:30am for fellowship and tech rehearsal, and Kevin’s presentation will start at 10:00am and last about an hour. We plan to post a recording of the event afterwards on the 4dPNRMovies YouTube channel.
Here is the Zoom info to join the live meeting on Saturday morning:
Join Zoom Meeting
https://us02web.zoom.us/j/87210657142?pwd=ZHhIWnZGMUU0YnAwNVUvMENheEZSUT09
Meeting ID: 872 1065 7142
Passcode: 805577