By Ed Ives

My earliest memories of trains were as a very, very, small child being carried into a room and on the floor was an oval of shiny 0 gauge tin track with a colorful train running around on it. Wow, I was set for life but with a few branchlines.

As a six year old for Christmas 1948 I was introduced to 00 gauge, a Hornby Dublo goods (freight) set that when in use was done so with adult supervision and when out of use was stored in my parents closet. This way it survives to this day although much added to over the years in its glorious three rail, tin printing and not a piece of plastic in sight. Yes you read it correctly, three rail 00 or H0 track!

As a young adult I had a hankering for ‘model’ trains as opposed to those compromised ‘toy’ trains and started down the track (excuse the pun) of scale British outline model trains in two rail 00 gauge. It was there that I realized 00 is not quite a scale gauge. The superstructure of the 00 gauge trains are 4mm to the foot whereas the track is H0 16.5 mm gauge or 3.5 mm to the foot and not 18.9 mm gauge. I felt a need for more precise modelling and investigated EM gauge or 18 mm gauge track, as well as P4 and S4 that were emerging with precise 18.9 mm gauge track and components.

I soon settled on EM gauge and would now need to make my own track as no EM gauge track was commercially available. I had grand plans for a large layout in the garage and decided to start building some simple stock like an 0-6-0 tank engine with no external valve gear and three passenger coaches, all from kits. With the interest in precision I purchased a book by David Jenkinson of British LMS passenger coaches. I started with the construction of the locomotive, a cast while metal kit of an LMS 0-6-0 Jinty. Hum, the kit left a lot to be desired as the two halves of the mold were not quite registered correctly which resulted in the need for a lot of filing and filling to get the boiler circular etc. I also discovered that with the wheels at the wider EM gauge then fouled the running plates on the side of the boiler and more metal removal would be required.

OK, putting that aside for a while, I started work on the coaches. Nothing could be simpler, or so I thought, as the kits comprised three basic components; a one piece plastic body, a metal underframe and a metal roof. Added to this were white metal castings of the trucks and truss rodding. Nothing much more than shake the box and all is assembled, or so it would appear. The plastic bodies lacked the hand rails and door handles as indicated on the drawings in David’s book. These were made from piano wire and installed. Oh, I need high frequency interior lighting for the coaches, or so I again thought, this of course being prior to DCC. Effective lighting was made using 1/8″ thick perspex, a grain of wheat bulb and some aluminum kitchen foil as a reflector. An old black and white TV was collected as a source of components for the construction of the high frequency lighting generator until a friend enquired about a license for it? License, what license? It seems that the generator might broadcast a signal and a broadcasting license might be required. Well I put that aside for a while wondering if even applying for a license would be a good idea or not.

Still on a roll I set to work on the coach roofs. Hum, a problem here as the supplied roofs were a little too short, of the wrong curvature and otherwise of no use. I will have to make new ones but how? Drape forming plastic came to mind. A mold was constructed using sheet metal and plaster. Plastic sheets from the model store were carefully placed on the mold and gently heated in the kitchen oven. Oh disaster! The plastic instead of draping over the mold would shrink and curl up, a total failure. Obviously the plastic had a memory that could not be easily overcome. A backup plan materialized making the roofs from galvanized sheet heating duct and proved to be quite easy to do. Now to add cast white metal ventilators and rainstrips made from piano wire. These were soldered to the roofs and the assemblies placed on the coach bodies. Hum these are looking quite good. Now for the underframe and trucks. Stepboards needed to be added to the trucks and were made from wood. The castings of the trucks and the truss rods needed some fettling to clean them up. The underframes lacked a lot of the details such as battery boxes and generators etc. that would be slung below. All this stuff was made using scrap materials available on the worktable and added. The plastic buffing gear on the coaches were cut off and sprung metal buffing gear added. The wheelsets that came with the kits were regauged to EM standards. Finally a length of track was made and the coaches were placed thereon. I say finally as this had only taken me three years to produce to this stage and I hadn’t begun to paint the coaches yet.

I was unhappy with the glazing of the windows due to the overly thick plastic body sides. I read that one could make individual windows from glass microscope slides. A count of the number of windows to be treated gave me a sickening feeling in my stomach with something like 120 windows to be made of two different sizes. I agonized over the guards (conductor) duckets on the sides of the brake coaches. These in the kits were solid bumps on the molded coach bodies. In the 12″ to the foot coaches these were hollow with small windows facing forward and aft that the guard could look out of and verify the signal aspects and the precise location of the train along the track. No window openings were provided on the model and how should I make them; hollowing out the plastic?, or removing the plastic ducket and making new hollow ones to be added? I finally decided to leave it alone for another time, our model guard would have nothing to look out of. The nail in the coffin or very nearly so, came when I tried to paint the coaches with Floquil primer. I thought I had the darkroom come laundry adequately ventilated with a box fan in the open window and my improvised cardboard paint booth, but not so, and I was quite unwell for a few days following the painting attempt. I also noted that the Floquil vapors apart from attacking my lungs attacked the plastic coach bodies but not fatally so in either case.

Much as I was pleased with the results so far, life would not be long enough to achieve my aims of a large working train layout, especially so, since children started to be added to the family. For the next twenty years the trains were put away due to family constraints.

When I resumed with trains in my late 50’s I could appreciate the advantages of colorful, noisy, ready to run, 00 and 0 gauge tinplate from so many years ago. Those collections resumed for the Hornby Dublo or began for 0 gauge, three rail of course. The Hornby Dublo collection is now assembled as a large layout in the spare/train room and the 0 gauge runs with the Hi-Rail modular group. 

Life is good.
Yours,
Ed Ives